
EMINENCE: New Song 'Critical Path' Available For Streaming, Download
July 23, 2013"Critical Path", a brand new song from Brazilian metallers EMINENCE, is available for streaming and download using the SoundCloud widget below. The track comes off the band's fourth full-length album, "The Stalker", which will be released on August 13 via CDBaby, iTunes and Amazon. The artwork for the CD, which includes a guest appearance by SEPULTURA bassist Paulo Xisto Pinto Jr., was created by Viktor Koen. The effort was produced by Tue Madsen (DARK TRANQUILITY, HEAVEN SHALL BURN).
"The Stalker" track listing:
01. Self Rejection
02. Unfold
03. 3 Times 6
04. Atmosphere (intro)
05. Veins Of Memories
06. The Stalker
07. Eyetricity
08. Satellite (intro)
09. Critical Path
10. No Code
11. Visions Of Hate
EMINENCE made its U.S. live debut last October aboard The Star of Palm Beach at Pier 40, West Houston St. at West Side Highway, in New York City.
EMINENCE's most recent CD, "The God Of All Mistakes", was released in March 2008 via Locomotive Records.
EMINENCE is:
Alan Wallace - Guitar
Bruno Paraguay - Vocals
Andre Marcio - Drums
Thiago Correa - Bass

